Rebuilding a commercial property following a disaster of this magnitude involves significant complexity, but property owners and developers do not have to navigate that process alone. Through the Mayor’s Emergency Proclamation, Maui County has established interim Recovery and Community Directives (RCDs) to streamline approvals, reduce administrative barriers, and provide a clear, predictable pathway for commercial recovery and rebuilding while preserving Lahaina’s historic character.

These directives are designed to:

  • Streamline permitting and approval processes
  • Reduce administrative barriers
  • Clarify parking standards, street improvements, and right-of-way obligations
  • Provide clear historic preservation expectations
  • Enable owners and developers to plan costs and timelines with greater confidence
  • Support safer, more functional spaces for businesses, employees, and customers
  • Maintain stable requirements throughout the recovery period to reduce uncertainty

Maui County remains committed to reducing complexity wherever it arises and to supporting the community through every stage of recovery.

Commercial Permitting Resource Directory for Lahaina Businesses

This guide provides a high-level overview of programs and permitting pathways. For full details, applications, and updates, please visit the websites listed below.

Download PDF flyer

Access all information below

1. Start Here: Identify Your Property Location

Property maps and district information

Your permitting pathway depends on where your property is located.

Properties may fall into one of the following categories:

  • Outside Special Management Area (SMA)
  • Within SMA
  • National Historic Landmark District (NHLD)
  • Historic District 1 or 2
  • Flood Zones
  • Shoreline / Makai of Front Street

Key Takeaway:
Confirm your property location first. This determines what permits and reviews apply.

2. Rebuild Lahaina Plan

Plan overview and updates

A comprehensive rebuild plan guiding the commercial core, streets, public space, mobility, and design standards.

Includes:

  • Community engagement themes
  • Commercial Architectural Design Guidelines
  • Streets & Mobility framework
  • Implementation timeline

Key Takeaway:
The Design Guidelines are intended to make review faster and more predictable.

3. Commercial Architectural Design Guidelines

Design Guidelines

New post-fire design guidelines developed for Historic District rebuilding.

Intended to:

  • Support faster staff review
  • Provide predictability for applicants
  • Reduce CRC review burden as rebuilding accelerates

Key Takeaway:
Projects that align with the guidelines may qualify for an administrative review pathway (RCD6).

4. Special Management Area (SMA) & Self-Certification

Planning Department information

Properties within the SMA may require:

  • SMA review or exemption
  • Category “W” Self-Certification Form
  • Flood Development Permit (if in AE or VE zone)

Key Takeaway:
Complete SMA Self-Certification accurately to avoid delays.

5. Flood Development Permits

Flood Zone information

Required for properties located in:

  • AE Flood Zone
  • VE Flood Zone

Issued by the Department of Public Works.

Key Takeaway:
Flood requirements may require structure elevation adjustments.a

=

6. Like-for-Like Reconstruction

Permit submission portal

“Like-for-Like” generally means:

  • Same structure
  • Up to 10% increase in floor area
  • Reconfiguration allowed
  • Elevation allowed for flood compliance

All building permits are subject to reconstruction determination by the Director.

Key Takeaway:
Like-for-like projects are typically the fastest pathway.

7. State Historic Preservation Division (SHPD) Review

State Historic Preservation Division HICRIS

Required for commercial parcels within the National Historic Landmark District under HRS §6E-10. The state uses an intake platform called HICRIS. You will need to create a login and password to submit your project. 

May occur during:

  • Historic District Assessment (HDX)
  • Building permit application process
  • Recommended as soon as the extent of ground altering activity is known

Key Takeaway:
Submit SHPD materials early for faster processing.

8. Recovery Permit Center

Permit Center information

Recovery Permitting is responsible for:

  • Building code review
  • Intake
  • Routing
  • Building inspections

Intake timeline: 1–3 business days
Building code review: 5 business days
Additional agency timelines vary.

Key Takeaway:
Separate permits may be required for grading, driveway, electrical, or plumbing work.

9. Strategic Voluntary Mitigation Buyout Program

Comment on the Action Plan

An optional recovery program is under review to be funded by CDBG-DR for certain commercial properties, primarily makai of Front Street and within Historic Districts.

Program features:

  • Voluntary participation
  • Independent post-disaster appraisal
  • Closing 

Key Takeaway:
The commenting period for the CDBG-DR Action Plan amendment to include a buy out program is open until March 3, 2026. If the program is approved, Participation is voluntary. Other recovery pathways remain available.

10. Next Steps for Business Owners

General information and updatesPlanning Department
  1. Identify your property location
  2. Confirm whether your project qualifies as like-for-like
  3. Prepare application materials
  4. Contact the Planning Department if questions arise regarding needed permits
  5. Submit for building permits through Permit Recovery Center